Services Used
See how adopting Oracle's Agile Product Lifecycle Management (PLM) for Process software helped a global food retailer to stay ahead of the competition.
After just two days’ work, Cintra had eradicated the inconsistency from the screens’ load times and reduced them from 120 seconds to two seconds: a reduction of over 98%.
Facing the pressing challenges of a legacy platform and the looming shadow of technical debt? It's time to look to the future and evolve. Dive into a world where downtime is minimized, efficiency is maximized, and the business is aligned to a flexible technology platform.
Starting Context: The global food retailer's Agile PLM system, essential for product management, was experiencing critical performance issues on Oracle databases.
Objectives of Optimization:
Significantly reduce load times of key application screens.
Achieve consistent and reliable performance for critical operations.
Implement solutions rapidly to avoid disruption to the impending system rollout.
Method R Performance Analysis:
Conducted an in-depth performance analysis using the data-driven Method R approach.
Identified specific bottlenecks in screen load times affecting user experience.
Solution Implementation:
Applied an Oracle patch on Day 1, reducing screen load times by 75%.
On Day 2, disabled an unnecessary Oracle Database 12c feature, further cutting down load times to two seconds.
Proposed code optimizations for future Agile PLM releases to Oracle.
Benefits & Advantages:
Dramatic Performance Improvement: Screen load times reduced from two minutes to two seconds, enhancing overall efficiency.
Rapid Response and Resolution: Performance issues resolved in a two-day timeframe, facilitating a successful system rollout.
Optimized User Experience: The substantial reduction in load times improved user adoption and satisfaction with the new system.